No Nama Peserta K SK SB B A T ST P PT HN H SH SA P PK Alasan
1 MANDIRI CAKTI CONSULTINDO - 01.615.883.4-952.000 68,79 85,85 71,51 Rp. 360.470.000,00
Rp. 360.470.000,00
100,0 8.005,0
2 CV. BULAUWAN PAPUA - 02.096.165.2-952.000 55,19 74,83 74,5 Rp. 364.705.000,00
Rp. 364.705.000,00
98,84 8.180,0
3 CV. FURIATAMA CONSULTANT - 01.615.637.4-952.000 57,86 85,0 79,87 Rp. 372.867.000,00
Rp. 372.867.000,00
96,68 8.491,0
4 CV. GALA TECHNOLOGIES CONSULTANT - 03.073.030.3-728.000 33,81 54,88 TIDAK MASUK BATAS KELULUSAN MINIMAL AMBANG BATAS
5 cv.pison autoglobal - 02.453.321.8-952.000 12,79 64,75 47,92 Skor Teknis tidak mencapai Passing Grade
6 GRIYA PERSADA - 02.285.397.2-941.000 65,9 TIDAK HADIR PEMBUKTIAN KUALIFIKASI
7 CV. Geo Teknik Konsultan - 02.339.843.1-952.000 38,26 38,26
8 PT.FAYA KUNTURA AGUNG - 81.021.807.3-952.000 57,21 82,5
9 CV. Lambda KreaSindo - 02.811.387.6-801.000 61,07 TIDAK HADIR PEM BUKTIAN KUALIFIKASI
10 PT. ARAS PASIFIK INTERNASIONAL - 02.281.918.9-952.000 39,59 39,59
11 PT. AMBAIDIRU KONSULTAN - 01.587.731.9-952.000 57,21 55,0 TIDAK MASUK DALAM BATAS KELULUSAN MINIMAL AMBANG BATAS MINIMAL 605
12 PT. CITRA DAYA BINA - 66.985.957.1-952.000 70,43 57,36 TIDAK MASUK DALAM BATAS KELULUSAN MINIMAL AMBANG BATAS MINIMAL 60
13 CV. SKALA CIPTA LESTARI - 02.820.747.0-805.000
14 CV. TRIGIL - 70.996.286.4-821.000
15 CV. INTERPOLASI MULTI SYSTEM - 66.119.566.9-803.000
16 PT. PARADHIGUNA DWIPANTARA LOKA - 72.003.128.5-822.000
17 CV. NETANELVITA - 03.129.290.7-801.000
18 CV. ADYCITRA CONSULTAN - 02.096.060.5-952.000
19 CV. AURARUPA TERPADU - 01.737.855.5-952.000
20 CV.CAROLIV - 02.571.828.9-941.000
21 CV. ZALIKA ENGINEERING - 02.453.617.9-952.000
22 CV.DURRUN ENGGINER - 74.101.966.5-952.000
23 PT. DITA MANDIRI KONSULTAN - 75.322.595.2-952.000
24 CV.JUAN MITRA KONSULTAN - 74.153.514.0-952.000
25 CV. NUSANTARA KONSULTAN - 01.768.891.2-952.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • B Pembuktian Kualifikasi
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak