No | Nama Peserta | K | B | A | T | ST | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. PRIMATAMA CONSULTANT - 01.972.771.8-952.000 | Rp. 135.000.000,30 |
Rp. 135.000.000,30 |
Tidak melampirkan tenaga teknis Surveyor 1 orang; tenaga teknis juru hitung kuantitas 1 orang dan tenaga operator CAD 1 orang. | ||||||||
2 | PT. ARAS PASIFIK INTERNASIONAL - 02.281.918.9-952.000 | |
|
|||||||||
3 | cv.pison autoglobal - 02.453.321.8-952.000 | Rp. 141.955.000,00 |
Rp. 141.955.000,00 |
Tidak melampirkan tenaga teknis Surveyor 1 orang dan tenaga teknis Juru Hitung kuantitas 1 orang | ||||||||
4 | CV. NAILAH MULTICON - 70.468.981.9-801.000 | |
|
|||||||||
5 | PT.FAYA KUNTURA AGUNG - 81.021.807.3-952.000 | |
|
|||||||||
6 | CV. GALA TECHNOLOGIES CONSULTANT - 03.073.030.3-728.000 | |
|
|||||||||
7 | PT. Duta Dwi Cipta Konsultan - 02.282.298.5-952.000 | |
|
|||||||||
8 | CV. INTERPOLASI MULTI SYSTEM - 66.119.566.9-803.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak