No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. KENCANA RANCANGTAMA KONSULTAN - 01.826.224.6-952.000 | 82,86 | 100,0 | 89,24 | Rp. 871.400.000,00 |
Rp. 871.400.000,00 |
100,0 | 91,0 | |||||||||
2 | PT. SECON DWITUNGGAL PUTRA - 01.119.163.2-424.000 | 81,07 | 81,07 | 93,41 | Rp. 900.405.000,00 |
Rp. 900.405.000,00 |
96,78 | 94,0 | |||||||||
3 | PT. ARAS PASIFIK INTERNASIONAL - 02.281.918.9-952.000 | 43,85 | SITU Masa Berlaku Habis | ||||||||||||||
4 | PT. INTIMULYA MULTIKENCANA - 01.216.271.5-441.000 | 66,61 | 68,75 | ||||||||||||||
5 | PT. PADURAKSA KONSULTAN - 02.390.537.5-429.000 | 80,0 | IUJK Klasifikasi Non Kecil | ||||||||||||||
6 | PT.FAYA KUNTURA AGUNG - 81.021.807.3-952.000 | ||||||||||||||||
7 | CV. Toba Aestetic Consultant - 03.213.480.1-952.000 | ||||||||||||||||
8 | PT. KOGAS DRIYAP KONSULTAN - 01.345.662.9-017.000 | ||||||||||||||||
9 | CV. TRIGIL - 70.996.286.4-821.000 | ||||||||||||||||
10 | CV. ART LIXAL - 02.096.222.1-952.000 | ||||||||||||||||
11 | PT. BAKTI LESTARI INDAH - 02.453.416.6-952.000 | ||||||||||||||||
12 | PT.BIOSFERA WIDHY ENGINEERING - 01.211.695.0-805.000 | ||||||||||||||||
13 | PT. ARTHA DEMO ENGINEERING CONSULTANT - 01.677.956.3-428.000 | ||||||||||||||||
14 | PT. MEDIA ARCHITECTS AND ENGINEERS - 01.499.179.8-952.000 | ||||||||||||||||
15 | CV. FURIATAMA CONSULTANT - 01.615.637.4-952.000 | ||||||||||||||||
16 | PT. Pillar Pusaka Inti - 01.678.572.7-013.000 | ||||||||||||||||
17 | PT. TATWA JAGATNATA - 01.615.597.0-952.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak