No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | PT. LILIAND ENGINEER CONSULTANT | 93.191.504.5-952.000 | Rp. 199.642.465,00 | Rp. 199.642.465,00 | Rp. 199.642.465,00 | |
2 | CV. CAHAYA RIAL KONSULTAN | 71.293.052.8-952.000 | ||||
3 | CV. BROTHERS ENGINEERING CONSULTANT | 80.511.496.4-801.000 |